Add Travis CI configuration to validate DCO and gofmt

After each push, Travis CI will trigger, and check two things:

- make sure that each commit in the push has the Docker certificate of origin
- make sure that all .go files changed by this sequence of commits are correctly formatted in the most recent commit

Note: there is one edge case; if you do a git force push, we cannot figure out the actual commits in the force push, and we will just run the checks as if upstream master were the base. Pull requests will always be tested correctly, though.

Docker-DCO-1.0-Signed-off-by: Andrew Page <admwiggin@gmail.com> (github: tianon)
This commit is contained in:
Tianon Gravi
2014-01-07 08:25:54 -07:00
parent a0298c0bd0
commit 561d1db074
5 changed files with 113 additions and 0 deletions
+21
View File
@@ -0,0 +1,21 @@
import os
import subprocess
if 'TRAVIS' not in os.environ:
print 'TRAVIS is not defined; this should run in TRAVIS. Sorry.'
exit(127)
if os.environ['TRAVIS_PULL_REQUEST'] != 'false':
commit_range = [os.environ['TRAVIS_BRANCH'], 'FETCH_HEAD']
else:
try:
subprocess.check_call([
'git', 'log', '-1', '--format=format:',
os.environ['TRAVIS_COMMIT_RANGE'], '--',
])
commit_range = os.environ['TRAVIS_COMMIT_RANGE'].split('...')
if len(commit_range) == 1: # if it didn't split, it must have been separated by '..' instead
commit_range = commit_range[0].split('..')
except subprocess.CalledProcessError:
print 'TRAVIS_COMMIT_RANGE is invalid. This seems to be a force push. We will just assume it must be against upstream master and compare all commits in between.'
commit_range = ['upstream/master', 'HEAD']